Project description:
- The Wolfe Island Wind Project consists of 86 2.3 MW wind turbines located on Wolfe Island, at the eastern end of Lake Ontario, in operation from 2008.
Customer challenges:
- Canadian Renewable Energy Corporation (CREC), a subsidiary of Canadian Hydro Developers Inc., needed design, manufacturing and supply of a world record-breaking high-voltage submarine power cable for the Wolfe Island Wind Project, near Kingston, Ontario, in Canada.
Nexans' solutions:
- The 7.8 km long cable was at the time the world’s first 3-core XLPE submarine cable to achieve a voltage rating of 245 kV.
- The Nexans cable will be laid on the bottom of the St Lawrence River, at a maximum water depth of 23 m.
|
|
Photo Credit: Trudy deRuiter